{"catalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","download":{"releaseId":"sha256:31ccdbcde94fb4d63b0cdda9a37195c04fe27dc6b59391d2db4d785f34b57409","slug":"grc-esg-risk-materiality-integration","url":"/assets/agent_workflow-grc-esg-risk-materiality-integration-851f73dc.1f62055510996e33.json"},"kind":"record","record":{"attributes":{"department":"risk-management","domain":"grc","lineOfDefense":"monitor"},"canonicalUrl":"https://workflow-library.com/all/?w=grc-esg-risk-materiality-integration","description":"ESG-Related Risk Materiality & Integration as a decision-aware workflow. Each cycle runs on the existing portfolio-level ESG Risk item (a Risk with category: esg — e.g. \"ESG / sustainability risk — enterprise\"): it enriches that umbrella entry and the ESG-tagged slice of the Risk register (Risk items tagged category: esg / taxonomies: esg_sustainability) rather than recreating them, and fans per-topic detail out onto the individual Risk items it creates or updates for each impact, risk, and opportunity (IRO). In scope: assessing ESG-related risks across the confirmed environmental, social, and governance topics, entities, and value-chain boundary for this cycle — defining the ESG risk universe (impacts, risks, opportunities), engaging affected stakeholders and information users, assessing double materiality and prioritizing the material topics, mapping controls and management responses, defining KRIs and disclosure metrics, and assembling disclosure inputs. Its named deliverables are the double-materiality assessment (the ranked material topic set with a materiality matrix), the control/response and assurance mapping, the disclosure metrics and leading KRIs, and the framework-mapped disclosure index (ESRS/CSRD, ISSB S1/S2, GRI, SEC climate). Out of scope: any ESG topic, entity, or business unit not named in this cycle's confirmed scope, and the drafting of the external sustainability report itself. It consumes the enterprise risk portfolio and residual positions from the upstream Enterprise Risk Assessment & Portfolio Oversight Cycle and hands its material ESG topics, KRIs, and disclosure inputs to the downstream Quarterly Board & Audit-Committee GRC Reporting workflow rather than duplicating repeated work.","details":{"canonicalUrl":"https://workflow-library.com/all/?w=grc-esg-risk-materiality-integration","capabilities":[],"controls":["UC-RISK-02","UC-RISK-05","UC-RISK-07","UC-RISK-08","UC-RISK-09","UC-GOV-21"],"domains":["grc"],"lineOfDefense":"monitor","mappingStatus":"mapped","releaseId":"sha256:31ccdbcde94fb4d63b0cdda9a37195c04fe27dc6b59391d2db4d785f34b57409","roleIntegrity":{"activityCount":0,"ermPhases":[],"lineRoles":[],"serviceModes":[],"warnings":[]},"sourceTemplateId":"workflow-library:grc-esg-risk-materiality-integration","standards":["coso-erm"],"teams":["risk-management","executive"]},"id":"wf:G5","mapUrl":"https://controlsmap.com/?v=1&node=wf%3AG5","slug":"grc-esg-risk-materiality-integration","sourceIds":["cobit-2019","coso-erm","coso-ic","iso-27001","iso-31000","nist-800-53","nist-csf-2","soc2"],"sourceUrl":null,"title":"ESG-Related Risk Materiality & Integration","type":"workflow"},"relationships":[{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:4fc04897f7a28ac3f07a7ecaeac439cde42f10cbebb114a4e68c208ac8a5c94a","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-risk-05-e2fc10a6.json","targetId":"uc:UC-RISK-05","type":"oversees"},{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:627e6ce34d65a9b323be58f51d06dba4250acf1ed5630e28a7279684473d473f","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-risk-09-06ffdff1.json","targetId":"uc:UC-RISK-09","type":"oversees"},{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:91dfeb71ae7b5413acc15e129d12942c098bed40469dccdac37064ef4150acec","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-risk-02-0f8519bb.json","targetId":"uc:UC-RISK-02","type":"oversees"},{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:9c7600613e0ef9ca1850dc6549b8f2e9f45bd1ebb7a9b4dbb568701d739ff524","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-risk-07-b86de728.json","targetId":"uc:UC-RISK-07","type":"oversees"},{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:da4b42425663414a75d805a4f176e27aabf8b91eefe850884376bfe37b7e09d6","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-gov-21-8c5d79f9.json","targetId":"uc:UC-GOV-21","type":"oversees"},{"expectedCatalogRevision":"24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028","id":"rel:f7107ccfc06867c20e74384f3400f48dc858a7649b9d024e3222aadf64b16781","properties":{},"sourceDetailPath":"/data/v1/records/wf-g5-873e0b12.json","sourceId":"wf:G5","targetDetailPath":"/data/v1/records/uc-uc-risk-08-5f27bebc.json","targetId":"uc:UC-RISK-08","type":"oversees"}],"schemaVersion":1}
