workflow
Equipment Maintenance, Movement & Marking Control
Standing operator workflow that runs on the existing physical-equipment Control item (the UC-PHYS-04/08/10/12 control, domains=physical_environmental_security, frequency=quarterly): each maintenance, movement, or installation/relocation event opens one workflow instance against that Control item and enriches it with the cycle's evidence, never creating a duplicate control. It covers equipment maintenance, asset movement, and installation/relocation siting and marking, converging into the quarterly reconciliation that ties all three evidence streams together. In scope: scheduled and unscheduled maintenance events, asset delivery/removal/movement events through isolated loading areas, and installation/relocation siting and hardware marking within the facility's data halls, plus the quarterly reconciliation of the three. Out of scope: media sanitization and data-disposal workflows and physical access-control administration, which are governed by their own controls. Named deliverables: the maintenance record pack, the asset movement record with designated-asset tracking reconciliation, the siting-and-marking record, and the consolidated quarterly reconciliation evidence set, plus Issue items for faults, movement investigations, and marking gaps. No upstream workflow feeds this cycle and it hands off to no downstream workflow; it is triggered directly by a maintenance, movement, installation/relocation, or quarterly-reconciliation event, is owned by the Data Center Operations Coordinator, and its close-and-archive step seeds its own next cycle via carry-forward Issue items linked to the Control.
Record JSON · Open in map · Data retrieval guide
Catalog revision: 24028ffcfc2b295fa1b08ee6caa84b765f0731b321496bf4f548c49ad2177028. A connection does not establish full coverage.
Attributes
- domain
- controls
- department
- facilities
- lineOfDefense
- operate
Details
- teams
- facilities
- it
- domains
- controls
- standards
- nist-800-53
- iso-27001
- sourceTemplateId
- workflow-library:controls-equipment-maintenance-movement-marking-control
- releaseId
- sha256:2362fbaa4e911d96dfff4c6484601e29fb0f960818ff589bde290703aa0a85d3
- canonicalUrl
- https://workflow-library.com/all/?w=controls-equipment-maintenance-movement-marking-control
- capabilities
- mappingStatus
- mapped
- lineOfDefense
- operate
- controls
- UC-PHYS-04
- UC-PHYS-08
- UC-PHYS-10
- UC-PHYS-12
- roleIntegrity
- activityCount
- 0
- ermPhases
- lineRoles
- serviceModes
- warnings
Source
No record-specific source URL is provided.
Download workflow template · Release: sha256:2362fbaa4e911d96dfff4c6484601e29fb0f960818ff589bde290703aa0a85d3
Connections
- Equipment Maintenance, Movement & Marking Control operates UC-PHYS-04 — Site facilities and equipment to minimize hazards and exposure
- Equipment Maintenance, Movement & Marking Control operates UC-PHYS-08 — Maintain equipment to preserve availability and integrity
- Equipment Maintenance, Movement & Marking Control operates UC-PHYS-12 — Mark hardware components with handling designations
- Equipment Maintenance, Movement & Marking Control operates UC-PHYS-10 — Control and track asset delivery, removal, and movement